Test Facility Shakedown and Commissioning

Standard:
Issued:
  • 2017-11-29
 
  • CURRENT
Publisher:
  • SAE International
Pages:
13
Scope:

The paper will concentrate on the main engineering engine related aspects of the facility and will not necessarily contain information on the construction validation activities such as HVAC, electrical, facility fire system, waste water etc.

Rationale:

This SAE Aerospace Information Report (AIR) is intended to provide guidance and recommendations to future or existing users of turbofan, turbojet, and turboshaft/turboprop gas turbine engine test facilities regarding commissioning readiness of new, modified, or re-located facilities.

History:
Standard Published Revision Status
AIR6364 2017-11-29 Latest Issued
Access
Now
SAE MOBILUS Subscriber? You may already have access.
Buy
Select
Price
List
Download
$76.00
Add
Mail
$76.00
Members save up to 18% off list price.
Grade
If you are currently using this technical report:
Share
HTML for Linking to Page
Page URL

Related Items

Technical Paper / Journal Article
1999-10-19
Technical Paper / Journal Article
2011-05-17