Design of Aircraft Deicing Facilities

Standard:
Revised:
  • 2013-03-28
 
  • CURRENT
Publisher:
  • SAE International
Pages:
39
Scope:

This document provides information and guidance material to assist in assessing the need for and feasibility of developing deicing facilities, the planning (size and location) and design of deicing facilities, and assessing environmental considerations and operational considerations associated with de-icing facilities. The document presents relevant information necessary to define the need for a deicing facility and factors influencing its size, location and operation. The determination of the need for deicing facilities rests with Airports. Although this document intends to provide information to airport operator and deicing facility planner/designer, all stakeholders, including deicing service providers, should be involved in the development process.

Rationale:

Revision B of this document provides updated information in conjunction with other applicable SAE documents and editorial changes. “Operation” has been removed from the title since this topic is now fully covered by ARP5660 “Deicing Facility Operational Procedures” Chapter 5 “Environmental Considerations” has been completely rewritten.

History:
Standard Published Revision Status
ARP4902B 2013-03-28 Latest Revised
2004-06-28 Historical Revised
1997-09-01 Historical Issued
Access
Now
SAE MOBILUS Subscriber? You may already have access.
Buy
Select
Price
List
Download
$76.00
Add
Mail
$76.00
Members save up to 18% off list price.
Grade
If you are currently using this technical report:
Share
HTML for Linking to Page
Page URL

Related Items

Training / Education
2013-02-20
Technical Paper / Journal Article
2010-10-19
Training / Education
2017-11-14