Gas Turbine Engine Power Take-Off Pad Requirements
|
Product Code: ARP748
Date Published: 1961-12-15 - A newer version of this standard is available.
Date Reaffirmed: May 1995
Issuing Committee:
E-25 General Standards For Aerospace And Propulsion Systems
Scope
An industry-wide survey indicates the need for power take-off pads on gas turbine engines intended for helicopter power plant installation. Specific attention has been given to this problem as related to the free turbine type of gas turbine engine. The gas generator of free turbine engines may be operated while the power turbine engine section is locked (O RPM). Under these conditions it may be desired to operate the gas generator in order to provide auxiliary power to the aircraft for various purposes. The purpose of this document is to summarize these requirements.
Product Status: In Stock
File Size:
62K
Purchase more aerospace standards and aerospace material specifications and save!
AeroPaks offers a customized subscription plan that lets you pay
for just the documents that you need, when you need them.
Learn more >
| Current & Historical versions of this standard |
| Standard |
Date published |
?Status |
| ARP748A |
2004-02-23 |
Revised |
| ARP748 |
1961-12-15 |
Reaffirmed |
|
Related Content
|