Installation Procedures and Torques for Fluid Connections

Standard:
Revised:
  • 2012-03-01
 
  • CURRENT
Publisher:
  • SAE International
Pages:
13
Scope:

These procedures cover the following: Paragraph 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket. Paragraph 4 - Boss end connections, positioned type, with back-up ring. Paragraph 5 - Boss end connections, positioned type, without back-up ring Paragraph 6 - Boss end connections, non-positioned type. Paragraph 7 - Bulkhead connections.

Rationale:

Complete revision of all figures and updating of specifications.

History:
Standard Published Revision Status
AS683D 2012-03-01 Latest Revised
2006-05-04 Historical Reaffirmed
1995-05-01 Historical Reaffirmed
1976-09-01 Historical Revised
Access
Now
SAE MOBILUS Subscriber? You may already have access.
Buy
Select
Price
List
Download
$76.00
Add
Mail
$76.00
Members save up to 18% off list price.
Grade
If you are currently using this technical report:
Share
HTML for Linking to Page
Page URL

Related Items

Training / Education
2014-07-15
Technical Paper / Journal Article
2011-04-12
Article
2016-12-08
Standard
1991-05-23