Openings for Six- and Eight-Bolt Truck Transmission Mounted Power Take-Offs(STABILIZED Nov 2017)

Standard:
Stabilized:
  • 2017-11-03
 
  • CURRENT
Publisher:
  • SAE International
Pages:
4
Scope:

The accompanying mounting and gear locations are applicable for all general installations of power take-off on the transmission gear box of motor trucks and tractors where the size of the transmission permits.

The heavy-duty type opening can be adapted to the regular-duty type by the use of an adapter with 6.35 mm (0.25 in) flange thickness with appropriate bolt pattern and thread engagement. (See Figures 1 and 2.)

Rationale:

This technical report is being Stabilized because it covers technology, products, or processes which are mature and not likely to change in the foreseeable future.

History:
Standard Published Revision Status
J704_201711 2017-11-03 Latest Stabilized
2000-09-07 Historical Reaffirmed
1983-06-01 Historical Revised
1978-04-01 Historical Revised
Access
Now
SAE MOBILUS Subscriber? You may already have access.
Buy
Select
Price
List
Download
$76.00
Add
Mail
$76.00
Members save up to 18% off list price.
Grade
If you are currently using this technical report:
Share
HTML for Linking to Page
Page URL

Related Items

Technical Paper / Journal Article
2013-09-24
Article
2017-03-13
Standard
1990-05-01
Standard
2014-07-09
Technical Paper / Journal Article
2011-04-12
Technical Paper / Journal Article
2013-09-24